Posted on: February 5, 2019
This is a reminder that as of January 1, 2019 parking cars, trucks, SUV’s and other passenger vehicles in any part of a residential yard that can be seen from the street is prohibited unless on an all-weather surface such as concrete, asphalt, g...
Read on...
Home
Posted on: February 5, 2019
Engineers from Kimley-Horn have submitted the attached conceptual design for Phase 3 of the Downtown Revitalization. This is only considered the 30% stage of the design phase, so the engineers are taking the feedback they have received from stakeholders a...
Read on...
Home
Posted on: January 24, 2019
NOTICE TO THE GENERAL PUBLIC OF IMPENDING ROAD WORK STARTUP
PAVING, DRAINAGE & UTILITY IMPROVEMENTS ON SOUTH YAUPON ST (WALNUT TO OLEANDER), OLEANDER ST (HICKORY TO MAPLE), HICKORY ST (MIMOSA TO OLEANDER), LOTUS ST (HICKORY TO PAS...
Read on...
Home
Posted on: September 20, 2018
I am excited to announce that the construction of the BASF Dog Park, behind the Recreation Center, will begin next week. The first step will be to install protection fence around the existing oak trees to avoid any damage to the root systems during constr...
Read on...
Home